C/M Light Bunker Punch - Stationary Energy



C/M Light Bunker Punch - Stationary Energy


LOW COST STATIONARY ENERGY 

High output Energy systems 

Building on 15 - 30 - 45 - 60+ diameter PVC pipes for Piston-Punch Stationary Energy Plants

We can dig these into a light seismic bunker & allow for air ventilation filtered which then provides Endless Energy once engaged with a 5-10 / 10-100 year part replacement model for low cost - low maintenance Energy 

Free to almost free keeping monthly operating costs at $2-25 per month or less for larger  installations on average as parts are not expensive in repair at the 5-10 / 10-100 year mark 

On - engaged + controls with the system live we have endless Zero-Emissions Energy then disengaged to maintenance & oversee any potential system & part failures before re-engaging with back ups so reliance is voided & the source user is never offline 

Use of PVC piping for a Piston-Punch 3+ Switch Back Air with or without Energy storage options then direct to Pelton conversion & even motor conversion equations in a circular Air Circulation "lung" design 

As air is drained while refilling we switch to a full system of air pressure then air refilled & we switch back between two or more as air recirculated through an inner design with value sequence controls then the outer side involves continual air compression then pressurization in a circular effort with new air added to circulate through some can spin peltons at different rates in different sizes against PZ Taps & additives for increased Energy Yields at the lowest cost then higher cost options integrated as accessories to achieve  

This will run a locomotive on rail as one or more carts stagered between other passenger & cargo carts 













Dr Sydney Nicola Bennett 

ENERGY DEEMED A BASIC NEED 

Existing Energy infrastructure will be a called down into a "just what we need" effort maintained as a piggybacked effort against other investments with a Public - Private Sector integration aligning with a Tiered Energy cost - price & delivery with maintenance effort deeming Energy under Basic Needs as we focus on raw materials, repurposing & remanufacturing then fast-growing silo-farming meeting the local - domestic & international equation effort  



60" 5 Ft PVC Pipe Reference 

https://trenchlesstechnology.com/diamond-plastics-manufactures-worlds-largest-solid-wall-pvc-pipe/

Dryer lint between safe non-toxin barriers as lower cost insulation... in a resourceful equivalent meeting Energy requirements 

A circulating non-combustion crude oil hydraulic system for Energy will be implemented amongst other options as we deplete Oil reserves & stop production out of no requirement with alternatives that are higher performance at a lower cost equivalent 


C/M Cypress Motors

Comments

Popular posts from this blog

Counter Attacks + Questions

Index: H.I.3 2016-2025 - 116 Posts

C/M City Bus - Retrofit Kits